News
With a growing need for pre-assembled buildings, Parkline has expanded our facilities to accommodate more, and larger, buildings. New crane systems have been installed for lifting and loading buildings more efficiently. Expansion began in 2009 and will be fully functional by early 2010. The picture to the right is showing an interior view of our new facility. The building shown is a two-piece portable classroom, that was the first building to be built in the new expansion. This picture was taken as the classroom was being prepped for lifting and loading. The picture below is a "birds-eye" view of our new pre-assembled division expansion.
|
![]() |


